Siemens HydroRanger 200 Instruction Manual Page 80

  • Download
  • Add to my manuals
  • Print
  • Page
    / 256
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 79
Page 66 HydroRanger 200 – INSTRUCTION MANUAL 7ML19981FC01
mmmm
m
Open Channel Monitoring
Open Channel Monitoring (OCM)
An OCM installation is defined one of three ways, based on the Primary Measuring
Device (PMD):
1. Dimensional (P600 = 2,3,6,7)
For some common weir and flume types. PMD dimensions (P602) are entered directly.
BS-3680 / ISO 1438/1 Thin plate V notch weir on page 68
BS-3680 / ISO 4359 Rectangular Flume on page 69
Palmer Bowlus Flume on page 70
H Flume on page 71
2. Exponential (P600 = 1)
For most other weir and flume types. PMD exponents provided by the manufacturer are
entered. Flow is calculated using the exponent (P601) and the maximum values (P603 and
P604).
Standard Weirs on page 72
Parshall Flume on page 73
Leoplod Lagco on page 74
Cut Throat Flume on page 75
3. Universal (P600 = 4,5)
For all other PMDs, the head-to-flow curve can be plotted based on known breakpoints,
usually supplied by the PMD manufacturer.
Typical Flow Characterization on page 76
Example Flumes on page 77
Example Weirs on page 77
Common Parameters
These Quick Start parameters are required for all installations.
Parameter Index Value Description
P001 G 6 Operation = OCM
P002 G 1 Material = liquid
P003 G 2 Max. Process Speed = medium
P004 G 102 Transducer = XPS-10
P005 G 1 Units = meters
P006 G 1.8 Empty = 1.8m
P007 G 1.0 Span = 1.4m
P801 G 0.8 Range Extension to avoid LOE
Page view 79
1 2 ... 75 76 77 78 79 80 81 82 83 84 85 ... 255 256

Comments to this Manuals

No comments