Siemens HydroRanger 200 Instruction Manual Page 51

  • Download
  • Add to my manuals
  • Print
  • Page
    / 256
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 50
7ML19981FC01 HydroRanger 200 – INSTRUCTION MANUAL Page 37
mmmmm
Relays
P111–Control Functions
The control function energizes the relay coils. When the instrument is at rest (no controls
operating) the relay coils are de- energized.
P112–Relay ON Setpoint
Sets the process point at which the relay is tripped.
P113–Relay OFF Setpoint
Sets the process point at which the relay is reset.
P115–Relay Interval Setpoint
Sets length of time between starts.
P116–Dead Band
Sets distance above and below the bound alarm setpoints.
P118–Relay Output Logic
Affects relay reaction. Reverses the logic (normally-open to normally-closed or vice
versa).
P129–Relay Failsafe
Changes how individual relays react to a failsafe condition on the instrument.
Relay Wiring Test
P119–Relay Logic Test
Checks the application wiring by forcing a relay control function, such as a level alarm or
pump control setpoint. Ensure all the relay programming and wiring works properly.
Please verify that ON and OFF respond correctly. Use P119 as a final test once all of the
relay programming is done.
Relay Activation
The flexibility of the relay functions ensures that the HydroRanger 200 can support relay
wiring for different systems and applications. Use the following as a guide to the most
common parameters.
Relay Setpoints and Functionality
When a setpoint is reached, the corresponding action is taken. The setpoint can be an
ON or OFF setpoint related to a process variable.
The setpoint can be an ON or OFF setpoint related to a process variable, or a timed
setpoint based on interval and duration.
Page view 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 255 256

Comments to this Manuals

No comments