Commissioning (software)
2.7 Commissioning modes
Control Units CU240S
Operating Instructions (Compact), 04/2006, A5E00766042B AA
2-47
Removing the MMC
To remove the MMC from the Control Unit, the following procedure should be performed:
6. Using a thin-bladed screwdriver, push down the release-catch on the MMC housing.
7. Grasp the MMC gently and pull upwards.
This procedure is shown in the figure below.
6,1$0,&6
6,1$0,&6
Figure 2-11 Removing the MMC from the Control Unit
2.7.9.5 Series commissioning with MMC
Upload and download a parameter set with an MMC
A parameter set can be uploaded from an inverter and then downloaded into another
inverter. The following important restrictions must be considered when using the copying
procedure:
An inverter with an apropriate parameter set is available (upload inverter)
The upload inverter can be accessed via OP, STARTER or PROFIBUS
An MMC Type 6SL3254-0AM00-0AA0 is available.
Upload a parameter set with an MMC
Prerequisites
To perform a series commissioning with the MMC the following conditions must be fullfiled:
Supply voltage is active for the upload inverter
The upload inverter is in "Ready State".