Commissioning (software)
2.7 Commissioning modes
Control Units CU240S
Operating Instructions (Compact), 04/2006, A5E00766042B AA
2-41
Finishing the application setting
Parameter Description (Factory setting: bold) Setting
P0971 = 1 Transfer data from RAM to EEPROM
0: Disabled
1: Start data transfer, RAM → EEPROM
All of the parameter changes are transferred from the RAM into the EEPROM which means
that they are saved in a non-volatile state within the Inverter (data is not lost when the power
fails).
While the transfer is active, "bUSY" will be displayed on the OP. Once the transfer is
completed P0970 will be set internally to "0" and the "P0970" will be displayed.
2.7.9 Series Commissioning
2.7.9.1 Series commissioning
Overview
Series commissioning means the possibility to transfer the parameter set from one inverter
into a number of other inverters which allows fast commissioning for identical applications
(for example series machines or group inverters).
The series commissioning is divided into the following steps:
create a proper parameter set
upload this parameter set
download of the uploaded parameter set into the new inverter
To perform series commissioning an appropriate parameter set must be available. This
parameter set can be created by parameterizing an Inverter via OP or STARTER.
Caution
Parameter download between different types of control units and of different firmware
versions is not recommended.
Basically, it is possible to download parameter sets off different CU types, however, as the
parameter sets might differ, the user is fully responsible for the consistency of the
downloaded parameter set.
Therefore, the customer has to confirm his responsibility in case of an automatic download
by acknowledging F0395.
Once an inverter with an appropriate parameter set is available, the parameter set can be
uploaded and in the next step downloaded into the new inverter via OP, STARTER or MMC.
The various interfaces are shown in the figure below.
Page view 60
1 ... 60 61 62 ... 110

Comments to this Manuals

No comments