Siemens SITRANS LR 300 Instruction Manual Page 29

  • Download
  • Add to my manuals
  • Print
  • Page
    / 140
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 28
7ML19985CL02 SITRANS LR 300 – INSTRUCTION MANUAL Page 27
mmmmm
Installation
Mounting
* Refer to the Rod Extension Requirements table on page 28.
Notes:
The Integral process seal MUST rest on the customer flange. See detail
showing a correctly mounted unit.
The straight/taper transition of the rod should extend past the nozzle/vessel opening.
Add extensions as required
.
WARNING: The user is responsible for the selection of bolting and
gasket materials which will fall within the limits of the flange and
its intended use and which are suitable for the service conditions.
WARNING: Improper installation may result in loss of process
pressure.
1/2" NPT
or M 20 x 1.5
conduit entries
Straight/taper Transition
Nozzle/Vessel
Juncture
Integral Process Seal
Customer Flange
Customer-flanged
Nozzle to suit
Wiring access
cover
Minimum diameter
2" / DIN 50
Tan k
Correctly Mounted Unit
Improperly Mounted Unit
Process seal should rest on flange
A
SITRANS LR 300.book Page 27 Monday, June 10, 2002 7:18 PM
Page view 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 139 140

Comments to this Manuals

No comments