Mechanical Installation
Siemens Building Technologies, Inc. 13
Mounting Dimensions
Frame Size A
Frame Size B
Frame Size C
Frame Size D
Frame Size E
Frame Size F
0.19
(4.8)
5.4
(138)
6.9
(174)
0.22
(5.5)
6.9
(174)
8.0
(204)
0.68
(17.5)
19.1
(486)
9.3
(235)
0.68
(17.5)
24.3
(616)
9.3
(235)
0.59
(15)
31.9
(810)
11.8
(300)
6.3
(160)
0.17
(4.5)
0.22
(5.5)
VFD0012R1
Figure 1. Mounting Dimensions of IP20 SED2 in Inches (Millimeters).
Mounting Instructions
The IP20 SED2 can mount side-by-side without space in between units.
There must be a minimum clearance at the top and bottom for ventilation
and equipment access.
Frame
Size
V
min
Minimum Clearance in
Inches (Millimeters)
A, B, C 4 (100)
D, E 11-3/4 (300)
F 13-3/4 (350)
SED2
SIEMENS
V
min.
V
min.
VFD0143R1
SED2
SIEMENS
Mounting Clearance Note:
If fitted with a protective shield, allow 12-inches (305 mm) of space
between each SED2 to allow for sufficient heat dissipation.