Page view 9
- 9 -
Installation
Doweling
Doweling the motor (and driven unit) accomplishes the
following:
1. Restricts movement.
2. Eases realignment if motor is removed from base.
3. Temporarily restrains the motor, should mounting
bolts loosen.
Inserting Dowel Pins
The following procedure is recommended:
a. Check the alignment after the unit has been in
operation approximately one week. Correct as
necessary.
b. Using pre-drilled dowel holes in motor feet as
guides, drill into the mounting base.
c. Ream holes in the feet and base to the proper
diameter for tapered dowel pins. Clean out the
chips.
d. Insert dowel pins.
Force Feed Lubrication
If force feed lubrication is used, flush lubrication lines
thoroughly to make sure the lines are clean before
connecting lines to bearing housings. Be sure that
bearing cavities are filled with oil to the proper level
before starting. See motor outline drawing to
determine proper oil level. Be sure that proper oil
pressure and flow are provided by the supply system.
Verify that the oil drain flow agrees with the factory
requirements. The orientation and size of oil drain
piping supplied with the motor must not be altered. Oil
drain piping should be of the same size or larger from
the motor piping to the oil sump. Piping must slope
downward. Pressure build up in the drain line between
the oil sump and the motor bearing housing can lead to
oil leakage. Document readings for warranty
information.
Oil Mist Purge
When connecting 500/580 frame motors for oil mist
purge, it is important to note that the drive and non-
drive end bearing cavities operate at different
pressures. To avoid high or low oil levels, care should
be taken when connecting the system so that cavity
pressures are maintained.