Siemens ISGS SG8158-00 User Manual Page 82

  • Download
  • Add to my manuals
  • Print
  • Page
    / 121
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 81
Appendix D: Acceptance Test Procedures
76 Siemens Energy & Automation, Inc.
ISGS Acceptance Test
Directional Neutral Time Overcurrent (67N)
Function
(Only Available with Phase-Neutral Connected VTs)
Set the ISGS as follows:
Parameter Set A 7103
5000:5 Current Transformer (CT) 1102
Curve SEA 5, Very Inverse 2002
1 A Nominal Pickup 2003
Time Dial per Chart 2005
Impedance to 45° 1907
Direction to Reverse 1908
Trip Matrixed to Trip 1 Contact 6401
Enable 67 2001
Disable Other Conflicting Functions 1501, 1551, 1601, 1651, 1801, 1901, 2001, 2301
Raise 51 Pickup to Maximum 1703
Phase
N Connections
1. Connect the appropriate source of control voltage to terminals 13 (+) and 12 (-).
2. Relay Disabled contact on terminals 19 and 20 opens.
3. Connect suitable variable source current
to phase A, terminal 3,
to phase B, terminal 5,
to phase C, terminal 7,
Connect terminals 4, 6, and 8 to terminal 9.
Connect terminal 10 to the common of the current sources.
4. Connect suitable AC voltage
to phase A, terminals 41 and 42,
to phase B, terminals 43 and 44,
to phase C, terminals 45 and 46,
Connect timer to Trip 1 contacts, terminals 1 and 2.
Pickup
5. Apply nominal voltage to the relays voltage inputs, for example,
for example, 69 V
0 to phase A,
69 V
240 to phase B,
69 V
120 to phase C.
Apply 2x pickup current to phase A in forward direction, for example,
for example, 2.0 A
0 to phase A,
2.0 A
240 to phase B,
2.0 A
120 to phase C.
-relay should not go into pickup,
-reset test current to zero A,
D
isv3o_1.bk : isv3otst.frm Page 76 Wednesday, August 7, 1996 10:51 AM
Page view 81
1 2 ... 77 78 79 80 81 82 83 84 85 86 87 ... 120 121

Comments to this Manuals

No comments