Siemens ISGS SG8158-00 User Manual Page 73

  • Download
  • Add to my manuals
  • Print
  • Page
    / 121
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 72
Appendix D: Acceptance Test Procedures
Siemens Energy & Automation, Inc. 67
ISGS Acceptance Test
Instantaneous Phase Overcurrent (50) Function
Set the ISGS as follows:
Parameter Set A 7103
5000:5 Current Transformer (CT) 1102
Curve SEA 5, Very Inverse 1702
20 A Nominal Pickup 1703
Time Dial 9.9 1705
Instantaneous Pickup 1 A 1501, 1502, 1503
Instantaneous Time Delay 0.0 1504
Trip Matrixed to Trip 1 Contact 6401
Phase
A B C Connections
1. Connect the appropriate source of control voltage to terminals 13 (+) and 12 (-).
2. Connect suitable variable source current
to phase A on terminals 3 and 4,
to phase B on terminals 5 and 6,
to phase C on terminals 7 and 8.
3. Connect a timer to the trip contacts on terminals 1 and 2.
Pickup
4. Apply a current approximately 75% of the instantaneous pickup.
5. Raise the current and note the value of current at which the relay trips.
Trip LED illuminates.
Timer stops on trip.
Display shows TRIP 50 P1 (2, 3).
Trip log shows TRIP 50 P1 (2, 3) and the correct date and time.
Trip log shows value of current at trip.
Wisdom software records trip in event log.
Return current to zero and reset timer.
6. Set value of current slightly above Instantaneous Overcurrent pickup and record time required to trip.
Repeat above steps for phase B and phase C; repeat the same steps also for Parameter Set B.
Tests may be repeated at required settings.
CAUTION: Extended testing at high current levels may damage the relay. Note rat-
ings (Maximum Input Current) in Chapter 1, Section 1.5, Test Specifications.
D
isv3o_1.bk : isv3otst.frm Page 67 Wednesday, August 7, 1996 10:51 AM
Page view 72
1 2 ... 68 69 70 71 72 73 74 75 76 77 78 ... 120 121

Comments to this Manuals

No comments