Siemens S7-200 User Manual Page 19

  • Download
  • Add to my manuals
  • Print
  • Page
    / 74
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 18
16
Solution Description and Test
As in the contactor circuit, you have
also switched a contact of the output
(Q0.0) parallel to the tripping element
(I0.0).
If, during a cycle, output Q0.0 has been
activated by operation of switch S1 at
I0.0, contact Q0.0 parallel to I0.0 appears
closed in the very next cycle (a few
milliseconds later). This brings about
latching. NC contact I0.1 can terminate
this when switch S2 at I0.1 is operated.
S
Save your completed program to
hard disk. Then you can load it
complete again at any time and
continue to process it (we will re-
quire the program again for our
OFF Delay example).
Latching
Latching
- Introduction
- Normally-Closed (NC) Contact
- Solution Description and Test
- A Different Take on Latching
Output Q0.0
parallel to the
input maintains
itself
Test your program by operating the two switches on the simulator connected at I0.0 and I0.1.
Observe the lamps on the S7-200 or the LAD status!
Begin by switching on I0.0.
I0.1 must be switched off. The LED at I0.0 must light up.
Q0.0 will then light up.
As soon as I0.1 is switched on, Q0.0 becomes ="0".
For test purposes, switch the PLC
to the "RUN" mode.
Then transfer the program to the
PLC to test the function.
Network 1
Latching Revision
Pulse-Oper-
ated Switch
Off-Delay
Timer
Sequencer Appendix
Page view 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 73 74

Comments to this Manuals

No comments