Siemens CP 1515 Operations Instructions Page 118

  • Download
  • Add to my manuals
  • Print
  • Page
    / 274
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 117
Configuration Using Web Based Management and the Command Line Interface
C79000-G8976-C184-07
118
d
System Ev
ge, you spec 78x reac s. You
can configure the reaction of the SCALANCE W78x to the
Startup of the SCA
Change in the Ethe wn.
Error in authentication.
Changing the power supply of the SCALANCE W78x. nt
is only useful when using a redundant power supply.
Change in the erro
If you use the SCALAN t, you nal
IP-Alive state chan ction
Link Check state ch e-specific connection monitoring)
Events related to bandwidth reservation iQoS
Authentication of the client
Detection of access points on own or an overlapping wireless channel.
Topology changes in Rapid Spanning Tree.
For the SCALANCE W788-1RR and SCALANCE W788-2RR models, events in
conjunction with iPCF.
Events in conjunction with the Forced Roaming on IP down function .
Change in the WDS connection status Link up / Link down.
With the SCALANCE W788-2PRO and SCALANCE W788-2RR models, there is
also the status of a redundant connection (redundant, not redundant, interrupted)
as a system event.
6.2.5 Event Config Menu Comman
ents of the SCALANCE W78x
On this pa ify how the SCALANCE W ts to system event
following events:
LANCE W78x
rnet status Link up / Link do
Evaluation of this eve
r status
CE W78x as an Access Poin can configure additio
system events:
ge (application-specific conne
ange (devic
monitoring)
Operating Instructions SCALANCE W78x
Page view 117
1 2 ... 113 114 115 116 117 118 119 120 121 122 123 ... 273 274

Comments to this Manuals

No comments