Installation and Maintenance
5.7 LED Displays and Troubleshooting
SIMATIC NET PROFIBUS Optical Link Module OLM V4.0
40 Operating Instructions, 01/2013, C79000-G8976-C270-03
Notes:
For a valid measurement, that the partner OLM at the other end of the fiber-optic cable must
send normal PROFIBUS frames. This can be recognized by the LED display of the partner
OLM (see section 5.7.1).
The output
voltages at the measurement sockets are influenced by many factors:
strength of the optical transmit power of the partner OLM
ambient temperature of the optical transmitter and receiver
attenuation of the transmission line
transmission rate used
The measurement sockets are therefore not intended as a substitute for a calibrated level
measuring device with a calibrated light source. The value obtained only serves to classify
the received optical signals in 3 classes:
good (normal operation, green) 5 V > U > 240 mV
critical (optical link margin reduced, yellow) 120 mV U 240 mV
bad (functionality not guaranteed, red) U < 120 mV
The measurement must be performed with a standard ungrounded and high-resistance
voltmeter. The internal resistance of the measurement sockets is approx. 30 k. A
connection from the measurement sockets or of reference potential to the OLM housing is
not permitted.
When an OLM of the SINEC L2FO type series is connected, the OLM V4 LED level indicator
has no meaning. The measurement sockets cannot be used.
5.7 LED Displays and Troubleshooting
5.7.1 LED displays
Figure 5-13 LED displays on the front panel