SIMATIC Panel PC 670/870 Commissioning Instructions 3–1
A5E00135748-01
3 Setting Up and Operating
Panel PC 670/870
3.1 Initial Startup and Normal Operation
The operating system is installed on the hard disk.
Checklist before startup
Before startup, go through the following checklist:
Have you considered the environmental conditions of the Panel PC 670/870
and the peripheral devices connected?
Are the peripheral devices connected properly and have all the required
presettings been made?
Caution
Risk of damage to the Panel PC 670/870.
Ensure that no condensation is formed on or in the device when transporting it
during cold weather periods or when it is exposed to extreme temperature
fluctuations.
Before commissioning, the device must be brought slowly to room temperature.
In case of condensation, wait approximately 4 hours before switching on the
device.
Activation
After connecting the peripheral devices and the system unit, the mains power
can be applied to the Panel PC 670/870.
Connect the Panel PC 670/870 to the mains. The green power LED lights up.
Initial startup
After connection to the mains, the Panel PC 670/870 performs a self-test.
During the self-test, the message
Press <F2> to enter SETUP appears
briefly.