This document guides you through the setup of proprietary vendor specific
software installed on your PC. Your supervisor may provide you with addi-
tional or alternative instructions.
The document consists of standard instructions that may not fit your particu-
lar solution. Please visit our support website for latest revisions of documen-
tation and firmware:
http://www.secomea.com
Version: 4.6, May 2014
Application Note
Siemens PLC and SIMATIC STEP 7 / TIA Portal
Page view 0
1 2 3 4 5 6 ... 41 42

Summary of Contents

Page 1 - Application Note

Page 1 of 42 This document guides you through the setup of proprietary vendor specific software installed on your PC. Your supervisor may prov

Page 2 - Table of Contents

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 10 of 42 7. You can now also observe dat

Page 3 - Prerequisite for this guide

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 11 of 42 3. MPI or PPI connection via

Page 4 - System overview

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 12 of 42 3. Now right click the LinkMana

Page 5

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 13 of 42 5. In the SIMATIC program, sele

Page 6

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 14 of 42 7. For the PC Adapter (MPI), se

Page 7

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 15 of 42 9. If the SIMATIC software disp

Page 8

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 16 of 42 4. MPI connection via Siemens P

Page 9

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 17 of 42 3. Select “Install the software

Page 10

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 18 of 42 4. Start the SIMATIC Manager

Page 11 - Adapter

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 19 of 42 5. Select “PC Adapter (Auto) fr

Page 12

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 2 of 42 Table of Contents Prerequisite

Page 13

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 20 of 42 7. Now, you should be able to a

Page 14

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 21 of 42 5. MPI or PPI connection via n

Page 15

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 22 of 42 5. Select the “IBHNet(MPI)” int

Page 16

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 23 of 42 7. Click the New station button

Page 17

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 24 of 42 8. Give the station a name, so

Page 18

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 25 of 42 10. Now, you should be able to a

Page 19

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 26 of 42 6. VMWare: TCP connection via

Page 20

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 27 of 42 2. Make sure the Network Adapte

Page 21

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 28 of 42 7. VMWare: MPI connection via R

Page 22

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 29 of 42 3. Add Serial Port to the Hardw

Page 23

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 3 of 42 Prerequisite for this guide The

Page 24

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 30 of 42 5. Set the port to the COM port

Page 25

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 31 of 42 8. VMWare: MPI connection via

Page 26 - Ethernet port

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 32 of 42 2. Make sure that USB Controlle

Page 27

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 33 of 42 Appendix A - Organizing COM port

Page 28

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 34 of 42 Appendix B - Setting the IP ad

Page 29

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 35 of 42 2. Next, “select IBHNet-Treiber

Page 30

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 36 of 42

Page 31

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 37 of 42

Page 32

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 38 of 42

Page 33

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 39 of 42 4. After reboot, start the “IBH

Page 34 - MPI Adapter

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 4 of 42 System overview The communication

Page 35

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 40 of 42 6. The software will automatica

Page 36

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 41 of 42 8. If the IP address is in the

Page 37

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 42 of 42 Notices Publication and copyrigh

Page 38

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 5 of 42 1. STEP7: TCP connection via nat

Page 39

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 6 of 42 4. Select TCP/IP -> VirtualBo

Page 40

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 7 of 42 7. In the project select PLC  E

Page 41

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 8 of 42 2. TIA Portal: TCP connection vi

Page 42 - Notices

Application note, Siemens PLC and SIMATIC STEP 7 / TIA portal Page 9 of 42 4. Open your project in the TIA