Siemens TC65 Specifications Page 107

  • Download
  • Add to my manuals
  • Print
  • Page
    / 120
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 106
TC65 Hardware Interface Description
Confidential / Released
s
TC65_HD_V02.000 Page 107 of 120 08.06.2006
6.2 Mounting TC65 to the Application Platform
There are many ways to properly install TC65 in the host device. An efficient approach is to
mount the TC65 PCB to a frame, plate, rack or chassis.
Fasteners can be M2 screws plus suitable washers, circuit board spacers, or customized
screws, clamps, or brackets. In addition, the board-to-board connection can also be utilized
to achieve better support. To help you find appropriate spacers a list of selected screws and
distance sleeves for 3mm stacking height can be found in Chapter
9.2.
When using the two small holes take care that the screws are inserted with the screw head
on the bottom of the TC65 PCB. Screws for the large holes can be inserted from top or
bottom.
For proper grounding it is strongly recommended to use large ground plane on the bottom of
board in addition to the five GND pins of the board-to-board connector. The ground plane
may also be used to attach cooling elements, e.g. a heat sink or thermally conductive tape.
To prevent mechanical damage, be careful not to force, bend or twist the module. Be sure it
is positioned flat against the host device.
All the information you need to install an antenna is summarized in Chapter
4. Note that the
antenna pad on the bottom of the TC65 PCB must not be influenced by any other PCBs,
components or by the housing of the host device. It needs to be surrounded by a restricted
space as described in Chapter
4.1.
Page view 106
1 2 ... 102 103 104 105 106 107 108 109 110 111 112 ... 119 120

Comments to this Manuals

No comments